Template draft. Replace everything in [square brackets] with your own decision,
delete what does not describe what you really do, and approve it through your own document control. It is not legal
advice and does not make an organisation compliant or certified.
1. Purpose
This policy sets out how the Organisation identifies, analyses, evaluates, treats, accepts, monitors and communicates information security risk. It gives one method, with fixed scales and tables, so that two assessors rating the same risk reach the same answer and so that top management can compare risks across the Organisation.
- Establish risk acceptance criteria and the authority needed to accept each level of risk.
- Make risk assessment repeatable, valid and comparable year on year.
- Link every control in the Statement of Applicability to a risk or a requirement.
- Give risk owners clear duties and a deadline for each decision.
2. Scope
The policy applies to all information, in any form, and to the assets that create, store, process or transmit it: people, premises, hardware, software, services, suppliers and processes within the ISMS scope in the ISMS Manual. It applies to all employees, contractors and suppliers who own, assess or treat risk.
- In scope: the annual assessment, assessments triggered by change, project, supplier or product assessments, site assessments, and risks raised from audits, incidents and threat intelligence.
- In scope: risks to the confidentiality, integrity and availability of information, including privacy risks to individuals whose personal data the Organisation handles.
- Out of scope: enterprise financial, strategic and market risks, which are managed under [the enterprise risk management framework]. Where such a risk depends on information security it is raised here and cross-referenced.
3. Terms and Definitions
| Term | Meaning |
|---|
| Asset | Anything that has value to the Organisation: information, software, hardware, services, people, premises and intangibles such as reputation. |
| Threat | A potential cause of an unwanted incident that may harm an asset, for example a ransomware attack, theft or a flood. |
| Vulnerability | A weakness of an asset or control that a threat can exploit, for example an unpatched system or an untrained user. |
| Likelihood | The chance that a threat exploits a vulnerability within the assessment period, rated 1 to 5. |
| Impact | The size of the consequence if the event occurs, rated 1 to 5 against business, legal, operational, reputational and people effects. |
| Risk | The combination of likelihood and impact for a scenario of threat exploiting vulnerability to harm an asset. Score = Likelihood x Impact. |
| Inherent risk | The risk before any controls are considered. |
| Residual risk | The risk that remains after controls have been applied and tested. |
| Risk appetite | The amount and type of risk top management is willing to pursue or retain to meet its objectives. |
| Risk acceptance criteria | The scores and conditions under which a risk may be accepted and by whom. |
| Risk owner | A person with accountability and authority to manage a risk, including accepting it. |
| Risk treatment | The process of choosing and implementing measures to modify risk. |
| Key risk indicator (KRI) | A measure that signals that a risk is rising or that a control is failing. |
| Risk register | The record of all identified risks with their ratings, owners, treatment and status. |
| Risk treatment plan (RTP) | The record of agreed treatment actions, owners, dates, resources and expected residual risk. |
4. Roles and Responsibilities
| Role | Responsibilities |
|---|
| Top management | Sets risk appetite and approves the risk acceptance criteria; accepts critical and high risks; provides resources for treatment; reviews the risk position at every management review. |
| Information Security Steering Committee | Reviews the risk register [quarterly]; approves treatment plans for high and critical risks; challenges ratings that look inconsistent. |
| Head of Information Security | Owns this policy and the method; checks the quality of assessments; reports risk status to top management. |
| Risk manager | Plans and runs assessment cycles, trains assessors, maintains the register and treatment plan, and chases overdue actions. |
| Risk owner | Reviews and agrees ratings for risks assigned; selects the treatment option; funds and completes treatment; accepts residual risk within authority. |
| Asset owner | Identifies and values assets; confirms the threats and vulnerabilities for their assets; ensures classification is current. |
| Control owner | Operates and evidences a control; reports when it is not working. |
| Internal audit lead | Tests that the method is followed and that treatment reduces risk as claimed. |
| Legal and compliance | Advises on legal and contractual consequences used in impact ratings. |
| All personnel | Report weaknesses, threats and near misses that may change a risk. |
| Activity | Responsible | Accountable | Consulted | Informed |
|---|
| Define risk appetite and acceptance criteria | Head of Information Security | Top management | ISSC; Legal and compliance | Risk owners |
| Maintain asset register and valuations | Asset owner | Head of IT operations | Risk manager | Head of Information Security |
| Perform annual risk assessment | Risk manager | Head of Information Security | Asset owners; control owners | ISSC |
| Agree ratings and treatment option | Risk owner | Risk owner | Risk manager; control owners | ISSC |
| Approve treatment plan | Risk owner | Top management for high and critical | Head of Information Security; Finance | ISSC |
| Implement treatment actions | Control owner | Risk owner | Risk manager | Head of Information Security |
| Accept residual risk | Risk owner | Authority in the acceptance table | Head of Information Security | ISSC; risk manager |
| Monitor risk and report | Risk manager | Head of Information Security | Risk owners | Top management |
| Audit the risk process | Internal audit lead | Top management | Head of Information Security | ISSC |
5. Risk Management Policy Statements
5.1 Governance and accountability
- Top management approves the risk appetite statement and the risk acceptance criteria in this policy at least every [12 months], and whenever the strategy or the threat landscape changes materially.
- Every risk on the register has a named risk owner who has the authority and budget to treat it or the authority to accept it. A risk without an owner is escalated to the Head of Information Security within [five working days].
- The risk manager reports the risk position to the Information Security Steering Committee [quarterly] and to top management at each management review.
- Nobody may accept a risk they created for their own benefit or approve the treatment of a risk in which they have a conflict of interest.
5.2 Risk appetite
The Organisation will not retain a risk that could lead to loss of control of customer or personal data at scale, serious harm to individuals, breach of law or contract with significant consequences, or loss of a critical service beyond its recovery objective. It accepts low risks as a normal part of operating, and medium risks where the cost of further control exceeds the benefit and the risk owner accepts them in writing.
- High and critical risks are outside appetite and must be treated or formally accepted by top management with an end date.
- Appetite is stated per category: [data confidentiality: low; service availability: low to medium; internal efficiency: medium].
5.3 Assessment
- A full assessment of all in-scope assets is performed at least every [12 months], and the register is updated at least [quarterly] in between.
- An assessment is also performed before go-live of a new service, system or supplier of critical services; on a significant change; after a high or critical incident; and when new threat or vulnerability information shows a rating is wrong.
- Every assessment uses the scales, tables and templates in this policy. Departures need the approval of the Head of Information Security.
- Assessors must be trained in the method. Asset owners must agree the valuation of their assets.
- Assessments must consider personal data risks to individuals as well as risks to the Organisation. A data protection impact assessment is required where the Data Protection and Privacy Procedure says so.
5.4 Treatment and acceptance
- Every risk above the low band has a treatment decision recorded within the deadlines in the acceptance criteria table.
- Treatment is chosen by comparing the cost and effect of options; the chosen controls are compared with Annex A so that no necessary control is missed, and the Statement of Applicability is updated.
- A risk may be accepted only by a person with the authority in the acceptance criteria table, in writing, with a review date no later than [12 months] and sooner for higher bands.
- Treatment actions overdue by more than [30 days] are escalated to the Information Security Steering Committee.
5.5 Monitoring, change and communication
- Risk owners review their risks at the frequency in the acceptance criteria table and confirm the rating is still right.
- A risk register entry is reopened if an incident, audit finding, vulnerability, change or threat report shows the rating or controls are no longer valid.
- Risk information is shared with those who need it to make decisions. Detailed risk register content is classified [Confidential] under the Information Classification and Handling Policy.
- The risk register is the single source for risk; separate lists kept in teams or projects must be merged into it at least [quarterly].
6. Risk Assessment Method
The method below is the Organisation's risk assessment procedure. The risk manager runs it; asset owners and risk owners take part. It follows the order: context and criteria, assets and value, threats, vulnerabilities, likelihood, impact, risk value, existing controls, evaluation, treatment, acceptance, monitoring.
6.1 Overview of the assessment cycle
- PrepareThe risk manager confirms scope, scales and participants, refreshes the asset register and the threat and vulnerability inputs. Output: assessment plan. Time target: [10 working days] before the cycle.
- Identify and value assetsAsset owners list assets in their area and rate confidentiality, integrity and availability. Output: valued asset register. Time target: [15 working days].
- Identify threats and vulnerabilitiesThe assessor with the control owner selects the credible threats for each asset and rates the vulnerabilities. Output: scenario list. Time target: [15 working days].
- Rate riskThe assessor derives likelihood and impact, calculates the inherent risk, records existing controls and calculates residual risk. Output: draft register. Time target: [10 working days].
- Review ratingsRisk owners confirm ratings. The risk manager moderates for consistency across areas. Output: agreed register. Time target: [5 working days].
- Decide treatmentRisk owners choose treatment and accept or reject residual risk within authority. Output: treatment plan and acceptances. Time target: per the acceptance criteria table.
- Report and monitorThe risk manager reports to the ISSC and top management and tracks actions to closure. Output: risk report.
| Activity | Responsible | Frequency | Output |
|---|
| Full assessment | Risk manager with asset owners | [12 months] | Updated register and treatment plan |
| Register review | Risk owners | Per acceptance table | Confirmed or revised ratings |
| Triggered assessment | Risk manager | On trigger | Risk entry or revised entry |
| Site assessment | Facilities lead with risk manager | [12 months] per site | Site assessment record |
| Supplier and product assessment | Procurement lead; product owner | Before use; then [12 months] | Assessment record |
| Control effectiveness testing | Control owners; internal audit | Per the Information Security Monitoring and Compliance Policy | Test result |
6.2 Context and criteria
Before each cycle the risk manager confirms the criteria that the assessment will use: the scales in this policy, the risk appetite, the legal and contractual requirements from the Internal and External Issues and Interested Parties statement, and the assessment period, which is [12 months] ahead. Changes to the scales are approved by top management and apply to the whole register from the next cycle so that results stay comparable.
6.3 Asset identification and grouping
Assets are taken from the asset register kept under the Asset Management Procedure. An asset that is not on the register is added before it is assessed. Similar assets that share threats, vulnerabilities and value (for example all laptops) are grouped to keep the register usable, but any asset with a higher value or a unique weakness is assessed alone.
| Asset category | Examples | Typical owner |
|---|
| Information | Customer data, personal data, source code, contracts, financial records, credentials and keys, designs, logs | Business or data owner |
| Software and applications | Business applications, internally developed software, operating systems, databases, middleware | Application owner |
| Hardware | Servers, network devices, laptops, mobile devices, storage media, security devices | Head of IT operations |
| Services and cloud | Hosted platforms, software-as-a-service, connectivity, identity services, managed services | Service owner |
| People | Staff with unique knowledge, privileged administrators, key suppliers' staff | HR; function head |
| Premises and facilities | Offices, data rooms, power, cooling, fire protection, physical access systems | Facilities lead |
| Processes | Order to cash, onboarding, incident response, software release | Process owner |
| Intangibles | Reputation, customer trust, intellectual property, certifications held | Top management |
6.4 Assigning asset value
Each asset is valued for confidentiality, integrity and availability on a scale of 1 to 5. The asset owner proposes the rating, using the highest rating whose description fits, and the risk manager moderates. The value of an asset is the highest of the three ratings.
6.4.1 Confidentiality rating
| Rating | Level | Description (disclosure to an unauthorised party) |
|---|
| 1 | Public | Already public or intended to be; no harm. |
| 2 | Internal | Minor embarrassment or inconvenience; no contractual or legal consequence. |
| 3 | Confidential | Harm to customers or the Organisation; probable breach of a customer contract; limited personal data. |
| 4 | Restricted | Significant harm; personal data at scale or sensitive personal data; trade secrets; credentials to production systems; likely legal consequence. |
| 5 | Highly restricted | Severe and lasting harm to individuals or the Organisation; master keys and secrets that unlock everything else; data whose loss would threaten the business. |
6.4.2 Integrity rating
| Rating | Level | Description (unauthorised or accidental change) |
|---|
| 1 | Negligible | Errors are noticed and corrected quickly at no cost. |
| 2 | Low | Rework of up to [one day]; no effect outside the team. |
| 3 | Moderate | Wrong decisions or outputs reach customers; correction takes days; limited cost. |
| 4 | High | Financial, legal or safety-relevant errors; reporting or billing misstated; correction is costly. |
| 5 | Critical | Undetected tampering could cause fraud, large-scale harm or loss of trust; the asset is a source of truth for others. |
6.4.3 Availability rating
| Rating | Level | Maximum tolerable outage |
|---|
| 1 | Negligible | [More than 5 working days] |
| 2 | Low | [1 to 5 working days] |
| 3 | Moderate | [4 to 24 hours] |
| 4 | High | [1 to 4 hours] |
| 5 | Critical | [Under 1 hour], or loss at any time is not tolerable |
6.4.4 Asset value and criticality class
Asset value = the highest of the confidentiality, integrity and availability ratings. The value sets the criticality class, which decides the depth of control and the frequency of review.
| Asset value | Criticality rating | Class | Consequence for control |
|---|
| 1 to 2 | Low | Standard | Baseline controls; reviewed [every 12 months] with the annual assessment. |
| 3 | Medium | Important | Baseline plus asset-specific controls; access reviewed [every 6 months]. |
| 4 | High | Critical | Strong controls, monitoring and tested recovery; access reviewed [quarterly]. |
| 5 | Very high | Vital | Strongest controls, named owner and deputy, tested recovery [twice a year], top management visibility. |
The confidentiality rating drives the information classification label under the Information Classification and Handling Policy: 1 is [Public], 2 is [Internal], 3 is [Confidential], 4 is [Restricted] and 5 is [Highly restricted]. Where the label and the rating differ, the higher applies.
6.5 Threat identification
A threat is considered for an asset only if it is credible for that asset. Inputs are the threat catalogue below, incident history, reports from the national computer emergency response team and sector bodies, the output of the Threat Intelligence Policy, penetration test results, audit findings and the experience of control owners. Each threat is rated from 1 to 3.
| Threat category | Examples |
|---|
| Malicious software and attack | Ransomware, phishing, credential theft, denial of service, exploitation of unpatched software, supply chain compromise |
| Insider action | Misuse of access, data theft by staff leaving, sabotage, collusion |
| Human error | Misdirected email, wrong configuration, accidental deletion, loss of a device, untrained users |
| Technical failure | Hardware failure, software defect, capacity exhaustion, failed backup, expired certificate |
| Physical | Theft, unauthorised entry, vandalism, tailgating |
| Environmental | Fire, flood, power loss, extreme heat, earthquake, pandemic |
| Third party | Supplier outage or breach, cloud failure, contractor error, loss of a key supplier |
| Legal and compliance | Change in law, regulator action, contract breach, loss of a licence |
| Threat rating | Level | Meaning |
|---|
| 1 | Low | Not expected to be attempted or to occur: low capability or motivation, no such event in the sector in the last [3 years]. |
| 2 | Medium | Could occur: known to affect similar organisations or the Organisation has seen attempts in the last [12 months]. |
| 3 | High | Is occurring or very likely: active attack campaigns, the Organisation has been targeted recently, or the event is routine in the environment. |
6.6 Vulnerability identification
Vulnerabilities are identified by the control owner with the assessor from vulnerability scans and penetration tests, configuration reviews, audit and assessment findings, incident root causes, process walk-throughs and supplier reports. A vulnerability is rated for the asset and the specific threat, not in general.
| Vulnerability rating | Level | Meaning |
|---|
| 1 | Low | A suitable control is in place, operated as documented and shown effective by a test within [12 months]. |
| 2 | Medium | A control exists but is partly implemented, not consistently operated or not tested in [12 months]. |
| 3 | High | No effective control, a known unpatched or exploitable weakness, or evidence the control failed. |
6.7 Likelihood
Likelihood is derived from the threat and vulnerability ratings so that it is not simply a guess. It is threat rating plus vulnerability rating minus 1, giving a value from 1 to 5. The assessor may move it one step up or down with a written reason, for example recent incidents or a compensating control not captured.
| Threat rating / Vulnerability rating | Vulnerability 1 (Low) | Vulnerability 2 (Medium) | Vulnerability 3 (High) |
|---|
| Threat 1 (Low) | 1 | 2 | 3 |
| Threat 2 (Medium) | 2 | 3 | 4 |
| Threat 3 (High) | 3 | 4 | 5 |
| Likelihood | Rating | Meaning in the next [12 months] |
|---|
| 1 | Rare | Not expected; once in [10 years] or less. |
| 2 | Unlikely | Could occur once in [3 to 10 years]. |
| 3 | Possible | Could occur once in [1 to 3 years]. |
| 4 | Likely | Expected once or more each year. |
| 5 | Almost certain | Expected several times a year, or already occurring. |
6.8 Impact
Impact is the consequence if the scenario occurs. It starts from the value of the property of the asset that is compromised: if the threat affects confidentiality the impact starts at the confidentiality rating, integrity at the integrity rating, availability at the availability rating. The assessor then checks the result against the table, which sets the consequence across several dimensions, and may adjust by one step with a written reason.
| Rating | Financial | Legal and contractual | Operations | Reputation and customers | People |
|---|
| 1 Insignificant | Under [INR 50,000] | None | Under [1 hour] of disruption to one team | Not noticed outside the team | No harm |
| 2 Minor | [INR 50,000 to 5 lakh] | Internal policy breach; no external consequence | Up to [4 hours] of disruption to a function | One customer inconvenienced | Minor, no lost time |
| 3 Moderate | [INR 5 lakh to 50 lakh] | Contract breach with one customer; reportable event handled without penalty | Up to [1 day] for a service | Several customers affected; complaint | Injury needing treatment; distress |
| 4 Major | [INR 50 lakh to 5 crore] | Regulatory inquiry or notification; multiple contract breaches | Up to [3 days] for a critical service | Public attention; loss of a significant customer | Serious harm to individuals |
| 5 Severe | [Over INR 5 crore] | Regulatory action; loss of licence or key contract; litigation | More than [3 days] or loss of the business capability | National media coverage; loss of trust in the market | Harm to many people or loss of life |
6.9 Risk value and risk matrix
Risk value = Likelihood x Impact, giving 1 to 25. The matrix below shows the score and the band for each combination. Bands: Low 1 to 4; Medium 5 to 9; High 10 to 16; Critical 20 to 25.
| Impact / Likelihood | 1 Rare | 2 Unlikely | 3 Possible | 4 Likely | 5 Almost certain |
|---|
| 5 Severe | 5 Medium | 10 High | 15 High | 20 Critical | 25 Critical |
| 4 Major | 4 Low | 8 Medium | 12 High | 16 High | 20 Critical |
| 3 Moderate | 3 Low | 6 Medium | 9 Medium | 12 High | 15 High |
| 2 Minor | 2 Low | 4 Low | 6 Medium | 8 Medium | 10 High |
| 1 Insignificant | 1 Low | 2 Low | 3 Low | 4 Low | 5 Medium |
6.10 Existing controls and residual risk
The assessor records the controls that currently operate against the scenario. The score calculated from threat and vulnerability ratings already allows for them, because the vulnerability rating reflects control strength. The inherent risk is calculated by rating the vulnerability as 3 (High), as if no control existed; the residual risk is calculated with the real vulnerability rating.
- If a control is documented but untested, not operated, or evidence shows it failed, the vulnerability rating is 3 and residual risk equals inherent risk.
- If no controls exist, or the controls are inadequate for the threat, the risk is defined as the inherent risk and must be treated.
- A planned control does not reduce residual risk until it is implemented and tested. The expected residual risk after treatment is recorded separately in the treatment plan as the target risk.
6.11 Worked example
The example shows the calculation for one scenario. The values are illustrative.
| Step | Result |
|---|
| Asset | Customer database in a hosted environment, owned by the Head of Operations |
| Asset value | Confidentiality 4 (personal data at scale); integrity 3; availability 4. Asset value 4, class Critical. |
| Threat | Phishing leading to credential theft by an external attacker. Threat rating 3 (High): campaigns against the sector in the last [12 months]. |
| Vulnerability | Multi-factor authentication not enforced for administrators. Vulnerability rating 3 (High). |
| Likelihood | 3 + 3 - 1 = 5 (Almost certain) |
| Impact | Confidentiality compromised, rating 4 (Major) |
| Inherent and residual risk | 5 x 4 = 20, band Critical. No effective control, so residual equals inherent. |
| Treatment decision | Modify: enforce multi-factor authentication for all administrators within [30 days]; add alerting on unusual admin sign-ins within [60 days]. |
| Target risk after treatment | Vulnerability rating 1; likelihood 3; impact 4; target score 12, band High. Because High remains outside appetite, the risk owner also adds privileged access monitoring and a review in [90 days]. |
| Authority | Critical: top management is informed within [24 hours]; interim control in place within [5 working days] |
7. Risk Acceptance Criteria and Risk Owners
A risk is evaluated against the criteria below once its residual score is known. The risk owner for each risk is the most senior person who has authority over the asset or process and over the budget to treat the risk; the asset owner is the default. Authority to accept rises with the band.
| Band | Score | Meaning | Who may accept | Treatment deadline | Review |
|---|
| Low | 1 to 4 | Within appetite | Risk owner | None required; monitor | [12 months] |
| Medium | 5 to 9 | Acceptable if cost of further control exceeds benefit | Function head as risk owner, informing the Head of Information Security | Treatment plan or acceptance within [60 days] | [6 months] |
| High | 10 to 16 | Outside appetite; accept only with an end date | Top management on the advice of the ISSC | Plan within [30 days]; complete within [90 days] | [3 months] |
| Critical | 20 to 25 | Unacceptable | Chief Executive Officer only, and only with documented compensating controls | Interim control within [5 working days]; top management informed within [24 hours]; plan within [10 working days] | [Monthly] |
Note. A risk of any band that involves a possible breach of law or a regulator notification duty must also be reported to Legal and compliance within [two working days] of being identified, whatever its score.
7.1 Risk owner duties
- Confirm the scenario, ratings and controls recorded for each assigned risk.
- Choose a treatment option within the deadline and fund it, or accept the risk within authority.
- Sign the acceptance record (Annexure D) with the reasons, the end date and the conditions.
- Review the risk at the frequency above and whenever the context changes.
- Notify the risk manager at once if the risk or its controls change.
8. Risk Treatment
8.1 Treatment options
| Option | Description | When appropriate | Example |
|---|
| Modify (reduce) | Apply or strengthen controls to reduce likelihood, impact or both | The default for medium, high and critical risks | Enforce multi-factor authentication; add encryption; segment the network |
| Retain (accept) | Accept the risk as it stands, or after treatment, with monitoring | Low risks; medium risks where further control costs more than the benefit; residual risk after treatment | Accept the risk of a short outage of an internal wiki |
| Avoid | Stop the activity or remove the asset that creates the risk | Risk is outside appetite and cannot be reduced at acceptable cost | Do not store card data; retire an unsupported system |
| Share (transfer) | Move part of the impact or the activity to another party by contract or insurance | Impact is high and likelihood low, or a specialist can run the control better | Cyber insurance; managed security service; cloud provider with contract assurances |
Sharing does not remove the Organisation's accountability for its own data. Where a supplier runs the control the Organisation retains the risk of the supplier failing and treats it under the Supplier Relationship Management Policy.
8.2 Treatment process
- Select optionThe risk owner picks the option with the risk manager's advice, comparing cost, effort, time to effect and the target risk. Time target: per the acceptance criteria table.
- Determine controlsThe control owner and risk manager list the controls needed, from Annex A and other sources, and compare them with Annex A to confirm none has been left out. Output: control list.
- Write the planThe risk manager records the actions, owner, due date, budget, dependencies and target risk in the risk treatment plan (Annexure C).
- AuthoriseThe plan is approved by the authority in the acceptance table. High and critical plans go to the ISSC and top management. Time target: [10 working days].
- ImplementControl owners complete the actions. Progress is reviewed by the risk manager [monthly]. Output: evidence of implementation.
- VerifyThe control is tested to show it works (a test, an inspection or a review of records). The risk is re-rated. Output: updated register.
- Accept residual riskThe risk owner signs the residual risk acceptance using the authority table. If the residual risk is still above appetite, the cycle repeats.
- Update the Statement of ApplicabilityThe Head of Information Security updates the Statement of Applicability so that every applicable control is justified by a risk or a requirement.
| Activity | Responsible | Accountable | Consulted | Informed |
|---|
| Choose treatment option | Risk owner | Risk owner | Risk manager; control owner | ISSC |
| Write treatment plan | Risk manager | Head of Information Security | Risk owner; control owner | ISSC |
| Authorise plan | ISSC | Top management | Finance; Legal and compliance | Risk owner |
| Implement control | Control owner | Risk owner | Risk manager | Head of Information Security |
| Verify and re-rate | Risk manager | Head of Information Security | Control owner; internal audit | ISSC |
8.3 Prioritisation
Treatment is sequenced by band first, then by the number of risks a single control addresses, then cost. A control that removes several high risks takes precedence over one that removes a single medium risk. Quick actions that cost under [a set amount] and remove a high risk are done without waiting for the cycle.
8.4 Management authorisation
Top management approves the risk treatment plan and accepts the residual risks it leaves. The approval is recorded with the date, the version of the plan and the list of risks accepted. Approval is repeated when the plan changes materially, and the acceptance of any single risk lapses on its end date.
9. Site Risk Assessment
Each site in the ISMS scope is assessed for physical and environmental risk [every 12 months], before a new site is taken into use, and after a significant change to the site, a relevant incident or a change in the local threat. The assessment follows the same scales and bands. The detailed controls are in the Physical and Environmental Controls Policy and the Physical and Environmental Security Procedure.
| S.No. | Activity | Responsibility | Output |
|---|
| 1 | List the site's assets, occupancy and critical areas (server and network rooms, records stores, media stores) | Facilities lead | Site profile |
| 2 | Inspect perimeter, entry points, visitor flow, locks, cameras, alarms and key control | Facilities lead with security officer | Completed checklist (Annexure E) |
| 3 | Check fire detection and suppression, power backup, cooling, water and flood exposure, and the condition of equipment rooms | Facilities lead | Checklist; photographs |
| 4 | Review natural hazard and local crime exposure and the history of incidents at the site | Risk manager | Hazard note |
| 5 | Rate each scenario and enter it in the risk register | Risk manager | Site risks in the register |
| 6 | Agree treatment and track it | Site risk owner | Entries in the risk treatment plan |
| 7 | Report to the ISSC | Head of Information Security | Summary in the metrics pack |
10. Other Risk Assessments
The same method applies to assessments that arise from other processes. Each produces entries in the same register.
| Trigger | Assessment | Detail document |
|---|
| New or changed product or service | Risk review before release and after major change | Product Risk Assessment Procedure |
| New or changed supplier of material services | Supplier risk assessment before contract and every [12 months] | Supplier Relationship Management Procedure |
| Change to production systems | Risk rating of the change, with rollback plan | Change Management Policy and Procedure |
| New cloud service | Cloud risk assessment before adoption | Cloud Computing Security Policy and Procedure |
| New processing of personal data | Data protection impact assessment | Data Protection and Privacy Procedure |
| Use of artificial intelligence | AI risk assessment before use | AI Governance Policy |
| Incidents and near misses | Update of affected risk ratings | Incident Management Procedure |
| Vulnerability and penetration testing | Findings rated and added to the register if not fixed in time | Vulnerability Assessment and Penetration Testing Procedure |
11. Risk Monitoring, Review and Reporting
Risks change as the threats, the controls and the business change. The risk manager keeps the register current and reports on it.
11.1 Triggers for reassessment
- A high or critical incident, or three or more medium incidents with the same cause within [90 days].
- A vulnerability rated critical that cannot be fixed within the patch window set in the Patch Management Policy.
- A new service, system, supplier or location, or a change in the use of existing assets.
- A change in law, regulation, contract or customer requirement, including those recorded in the Internal and External Issues and Interested Parties statement.
- An internal or external audit finding that shows a control did not work.
- A change in the threat picture reported through threat intelligence or the national computer emergency response team.
11.2 Risk reporting
The risk manager issues a risk report to the Information Security Steering Committee [quarterly] and to top management with the management review. The report shows risks by band, new and closed risks, overdue treatment actions, risks accepted and their end dates, key risk indicators and the top [10] risks with owner and status.
11.3 Key risk indicators
| Indicator | What it signals | Threshold for escalation |
|---|
| Count of critical or high risks open beyond their deadline | Treatment is not keeping pace | [Any critical; more than 3 high] |
| Critical vulnerabilities outside the patch window | Rising likelihood of compromise | [More than 5 or any on internet-facing systems] |
| Privileged accounts not reviewed on schedule | Access risk growing | [Any overdue by more than 14 days] |
| Backup restore test failures | Availability risk understated | [Any failure on a critical system] |
| Phishing simulation click rate | Human risk rising | [Above 8 percent] |
| Suppliers of critical services without a current assessment | Supply chain risk unmanaged | [Any] |
| Risk acceptances past their end date | Decisions not renewed | [Any] |
12. Compliance and Monitoring
- The risk manager checks every [quarter] that all risks have an owner, a rating dated within the review period and a treatment decision within deadline, and reports exceptions to the ISSC.
- The internal audit lead tests the method [every 12 months] by sampling assessments, re-performing ratings and checking treatment evidence against what the register states.
- The Head of Information Security reviews the scales, the acceptance criteria and the threat catalogue with the ISSC [every 12 months] to confirm they still fit the Organisation.
- Any risk accepted outside the authority in this policy is a nonconformity and is handled under the corrective action process in the ISMS Manual.
13. Records and Evidence
| Record | Owner | Where kept | Retention |
|---|
| Risk register with history | Risk manager | [Risk register tool] | [5 years after a risk is closed] |
| Asset register with valuations | Head of IT operations | [Asset management tool] | [Life of the asset plus 3 years] |
| Risk treatment plan with approvals | Risk manager | [Document management system] | [5 years] |
| Risk acceptance records | Risk manager | [Document management system] | [5 years after end date] |
| Assessment working papers and moderation notes | Risk manager | [Document management system] | [3 years] |
| Site assessment records | Facilities lead | [Document management system] | [5 years] |
| Risk reports to ISSC and top management | Head of Information Security | [Document management system] | [5 years] |
14. Measures
| Measure | Target | How measured |
|---|
| Annual assessment completed on schedule | [100 percent of in-scope assets] | Register dates against plan |
| Risks with an owner and a current rating | [100 percent] | Register query |
| Treatment actions closed by the due date | [90 percent] | Treatment plan report |
| High and critical risks with an approved treatment plan within deadline | [100 percent] | Register query |
| Residual risks above appetite without top management acceptance | [Zero] | Register query |
| Rating differences found on audit re-performance | [Under 10 percent differ by more than one step] | Internal audit sample |
15. Procedures and Related Documents
This policy contains the full risk assessment method. The Asset Management Procedure supplies the asset register that feeds step one of the method. Controls selected through treatment are traced to the Statement of Applicability, and the results are reviewed under the ISMS Manual. Product-level assessments follow the Product Risk Assessment Procedure.
Annexure A: Asset register template
| Asset ID | Asset and description | Owner | Location | C | I | A | Value and class |
|---|
| A-001 | Example: customer database | Head of Operations | Hosted environment | 4 | 3 | 4 | 4 Critical |
| | | | | | | |
| | | | | | | |
Annexure B: Risk register template
| Risk ID | Asset, threat and vulnerability | L | I | Inherent score and band | Existing controls and residual score | Treatment option and owner | Status and review date |
|---|
| R-001 | Example: customer database; phishing; no MFA for administrators | 5 | 4 | 20 Critical | None effective; residual 20 | Modify; Head of Operations | Open; monthly |
| | | | | | | |
| | | | | | | |
Annexure C: Risk treatment plan template
| Risk ID | Treatment action | Control reference (Annex A) | Owner | Due date | Budget | Target score |
|---|
| R-001 | Example: enforce multi-factor authentication for all administrator accounts | A.8.5 | Head of IT operations | [30 days] | [Amount] | 12 High |
| | | | | | |
| | | | | | |
Annexure D: Risk acceptance record
| Field | Entry |
|---|
| Risk ID and description | |
| Residual score and band | |
| Reason treatment is not being applied or is not complete | |
| Compensating controls and monitoring | |
| Conditions of acceptance | |
| Risk owner (name, role) and signature | |
| Approver in line with the acceptance table (name, role) and signature | |
| Date accepted and end date | |
Annexure E: Site risk assessment checklist
| Area | Question | Finding | Rating 1 to 5 | Action and owner |
|---|
| Perimeter and entry | Are entry points controlled, logged and monitored? Is key or card control reviewed? | | | |
| Secure areas | Are server, network and records rooms locked, with access limited to named people? | | | |
| Fire and safety | Are detection, suppression, extinguishers and exits inspected and in date? | | | |
| Power and cooling | Is backup power tested? Are temperature and humidity monitored? | | | |
| Water and flood | Are equipment rooms above flood risk and free from water pipes? | | | |
| Visitors and deliveries | Are visitors registered, badged and escorted? | | | |
| Equipment and media | Are devices, cables and removable media protected and tracked? | | | |
| Surveillance | Are cameras covering entries and secure areas, with recordings kept for [90 days]? | | | |
16. Exception
Exceptions to this document are allowed only where compliance is not practicable and the risk has been assessed. A request must state what is to be excepted, why, the risk it creates, the compensating controls, and an end date no later than [6 months]. It is approved in writing by the document owner and the risk owner, recorded in the exceptions register, and reviewed at the end date. An exception does not change the document.
17. Enforcement
Compliance is monitored through internal audits, management review and routine checks by the document owner. Non-compliance is reported through the incident or non-conformity process and handled under the organisation's disciplinary procedure, and under the terms of any contract for people who are not employees. Serious or repeated non-compliance may lead to loss of access and, where the law is broken, to referral to the authorities.
18. Review
This document is reviewed at least every [12 months], and when there is a significant change to the organisation, its systems, its risks or the law, or after an incident that shows it was not effective. Each review is recorded in the revision history.
ISO/IEC 27001:2022 references
| Reference | Title |
|---|
| 6.1.2 | Information security risk assessment |
| 6.1.3 | Information security risk treatment |
| A.5.9 | Inventory of information and other associated assets |
| A.5.12 | Classification of information |
| A.5.7 | Threat intelligence |
| 8.1 | Operational planning and control |
| A.5.36 | Compliance with policies, rules and standards for information security |