Security Risk Register Template

A practical structure for owners, scoring, treatment, evidence and closure tracking, with a spreadsheet you can download.

Template3 min read Updated 1 Nov 2026 For security and compliance leads, risk owners, ISO 27001 teams

A risk register is the list of what could go wrong, how likely and how bad, who owns it, and what is being done. Done well it is the one document that turns security from a list of tasks into a set of decisions a manager can make. Done badly it is a spreadsheet nobody has opened since the last audit.

ISO/IEC 27001:2022 requires a documented risk assessment process (clause 6.1.2) and risk treatment (6.1.3), and the register is how most organisations evidence both. ISO 31000 describes the wider practice of risk management.

The columns, and why each is there

ColumnPurpose
ID, date raisedGives every risk a stable reference and a history.
Risk titleOne sentence a manager can read in a meeting.
Asset or processWhat is at stake.
Threat and vulnerabilityWhat could happen, and the weakness that lets it.
Existing controlsWhat already reduces the risk, so you do not double count.
Likelihood, impact, scoreThe assessment, on a scale you have defined.
Risk ownerA named person with the authority to act. Never a team.
Treatment and actionsWhat you will do, and by when.
Residual likelihood, impact, scoreThe risk after the treatment, which is what management accepts.
Status and evidence of closureWhether it is done and how you can show it.
Last reviewedWhen someone last looked at this row.

A scoring scale to start from

Score likelihood and impact from 1 to 5 and multiply. The bands below are an example. Define your own criteria, write them down and apply them consistently, because ISO 27001 asks for consistent and comparable results.

ScoreRatingSuggested response
1 – 4LowAccept, and review at the next cycle.
5 – 9MediumTreat within a planned period.
10 – 15HighTreat with priority and a named deadline.
16 – 25CriticalEscalate to senior management now.

The four ways to treat a risk

  • Mitigate: add or improve controls to reduce likelihood or impact.
  • Accept: knowingly keep the risk, with the owner's and management's sign-off recorded.
  • Transfer: share the risk, for example through insurance or a contract. Responsibility is not transferred, only some of the cost.
  • Avoid: stop the activity that creates the risk.

A worked example

This is an illustration of the level of detail that works, not a real assessment.

FieldExample
RiskCustomer data is exposed through an internet-facing admin portal without multi-factor authentication.
Likelihood × impact4 × 5 = 20, Critical.
OwnerHead of Engineering.
TreatmentMitigate: enforce MFA, restrict the portal to the corporate network, review admin accounts.
Residual1 × 5 = 5, Medium.
Evidence of closureA configuration export showing MFA enforced, and the firewall rule limiting access.

Keeping it alive

  • Review the high and critical rows monthly and the whole register at least once or twice a year.
  • Add a risk whenever something changes: a new vendor, a new system, an incident, a new regulation.
  • Close a risk only when there is evidence, not when the ticket is closed.
  • Show the top risks to management regularly. A register that never reaches a decision-maker is not doing its job.
Note. Download the template, replace the example rows and make the scoring scale your own.