1. Introduction
A management system that is never examined drifts: procedures stay on paper while practice moves on. Internal audit is the Organisation's own periodic examination of whether the service management system conforms to its requirements and to the standard, and whether it is working. Management review is the point at which top management looks at all of the evidence, including audit results, and decides what to change.
The two activities are in one procedure because the output of the first is a main input to the second, and because corrective action ties them to the improvement register in the Service Reporting and Continual Improvement Procedure.
2. Purpose
The purpose is to provide information on whether the service management system conforms to the Organisation's own requirements and to the requirements of ISO/IEC 20000-1:2018 and is effectively implemented and maintained; to make sure that nonconformities are corrected and their causes removed; and to make sure that top management reviews the system at planned intervals and records its decisions.
3. Objectives
- Every clause of the standard and every service in scope is audited at least once in each [12 month] cycle, with higher-risk areas audited more often.
- Audits are carried out by auditors who are competent and who do not audit their own work.
- Every finding is recorded, classified and given an owner and a due date within [10 business days] of the audit report.
- Major nonconformities are corrected and their cause removed within [60 days]; minor within [90 days].
- Management review takes place at least [twice a year] and its decisions are recorded and tracked to completion.
4. Scope
- In scope: the whole service management system as defined in the SMS Scope and Service Management Plan, all clauses 4 to 10 of the standard, every documented process, every service in scope, and the organisational locations and teams that deliver them.
- In scope: processes or services delivered by suppliers, to the extent that the Organisation retains accountability, through audit of supplier management and, where the contract allows, a supplier audit.
- In scope: the conduct of management review.
- Out of scope: external certification or surveillance audits and customer audits, which are planned separately and which this procedure supports by supplying the latest internal audit evidence.
- Out of scope: audits of information security alone, which follow the Information Security Monitoring and Compliance Policy; they are combined with service management audits where practical.
5. Terms and Definitions
| Term | Meaning |
|---|
| Audit programme | The set of audits planned for a period, with objectives, scope, criteria, methods, resources and schedule. |
| Audit criteria | The requirements the system is audited against: the standard, the Organisation's policies and procedures, and contract or legal requirements. |
| Audit evidence | Records, statements of fact and other verifiable information relevant to the criteria. |
| Finding | The result of comparing evidence with criteria: conformity, nonconformity, observation or opportunity. |
| Major nonconformity | Absence of a required process, repeated failure, or a failure that affects service or customers significantly. |
| Minor nonconformity | An isolated failure to meet a requirement that does not by itself prevent the system achieving its intended results. |
| Observation | A matter that is not a nonconformity but may become one or can be improved. |
| Corrective action | Action taken to remove the cause of a nonconformity and to prevent recurrence. |
| Management review | A planned review of the system by top management, based on defined inputs, resulting in recorded decisions. |
6. Roles and Responsibilities
| Role | Responsibilities |
|---|
| Top management | Approves the audit programme, provides resources, attends management review, decides actions and resources, and makes sure nonconformities are not hidden. |
| Management representative | Owns this procedure, prepares the audit programme and management review, appoints audit teams, reports results and tracks corrective action. |
| Lead auditor | Plans each audit, leads the team, concludes findings, writes the report and holds the closing meeting. |
| Internal auditor | Collects evidence against the criteria, records findings objectively and does not advise on how to fix them in the area they audit. |
| Process owner | Provides access and evidence, agrees findings, proposes corrective actions for the process and makes sure they are carried out. |
| Service owner | Takes part in audits of services, answers findings on the service and owns corrective action. |
| Auditee | Any person interviewed or observed; answers honestly and without delay. |
| Process manager | Supports the audit calendar and keeps the register and records. |
| Activity | Responsible | Accountable | Consulted | Informed |
|---|
| Prepare and approve audit programme | Management representative | Top management | Process owners | All staff |
| Plan each audit | Lead auditor | Management representative | Process owner | Auditees |
| Carry out audit and record evidence | Internal auditors | Lead auditor | Process owner | Management representative |
| Report findings | Lead auditor | Management representative | Process owner | Top management |
| Plan and carry out corrective action | Process owner | Process owner | Lead auditor, Management representative | Top management |
| Verify corrective action | Lead auditor | Management representative | Process owner | Top management |
| Prepare management review inputs | Management representative | Top management | Process owners | Attendees |
| Hold management review and decide | Top management | Chief Executive Officer | Management representative, Process owners | All staff |
7. Audit Programme
7.1 Planning principles
- The programme covers a [12 month] cycle and is approved by Top management by [the end of the first month] of the cycle.
- Frequency and depth are set by the importance of the process to customers, results of earlier audits, recent change, incident history and supplier dependence.
- A process with a major nonconformity open, a failed target or a recent significant change is audited again within [3 months] or sooner.
- Audits cover a sample of services across the cycle, so that every service is examined at least once and critical services at least [twice].
- The programme may be changed during the year by the Management representative, with changes noted to Top management, but a planned audit may not be cancelled because of workload alone.
7.2 Audit calendar
The calendar below is the default programme over the clauses of ISO/IEC 20000-1:2018. Dates are set at the start of each cycle in the audit plan.
| Quarter | Clauses and processes audited | Planned period | Lead | Output |
|---|
| Q1 | Clause 4 Context, 5 Leadership (policy, roles), 6 Planning (risks, objectives, plan the SMS), 7.1 to 7.3 resources, competence, awareness | [Month 2 to 3] | [Lead auditor A] | Audit report Q1 |
| Q1 | 7.4 Communication, 7.5 Documented information; Communication Procedure | [Month 3] | [Lead auditor A] | Audit report Q1 |
| Q2 | 8.2 Service portfolio: service catalogue, asset management, configuration management | [Month 5] | [Lead auditor B] | Audit report Q2 |
| Q2 | 8.3 Relationship and agreement: business relationship, service level, supplier management | [Month 6] | [Lead auditor B] | Audit report Q2 |
| Q3 | 8.4 Supply and demand: budgeting, demand, capacity; 8.5 Service design, build and transition: change, design and transition, release and deployment | [Month 8 to 9] | [Lead auditor A] | Audit report Q3 |
| Q3 | Service evaluation against Service Evaluation Criteria for releases in the cycle | [Month 9] | [Lead auditor A] | Audit report Q3 |
| Q4 | 8.6 Resolution and fulfilment: incident, service request, problem | [Month 11] | [Lead auditor B] | Audit report Q4 |
| Q4 | 8.7 Service assurance: availability, service continuity, information security | [Month 11 to 12] | [Lead auditor B] | Audit report Q4 |
| Q4 | 9.1 and 9.4 Monitoring, measurement and service reporting; 10 Improvement; follow-up of earlier findings | [Month 12] | [Lead auditor A] | Audit report Q4; annual summary |
| Any | Follow-up audit of a process after a major nonconformity | [Within 3 months] | [Lead auditor] | Follow-up report |
| Any | Supplier audit where the contract allows | [As planned in supplier review] | [Supplier manager and Lead auditor] | Supplier audit report |
| Cycle end | Management review preceded by the annual audit summary | [Month 12 and Month 6] | Management representative | Management review minutes |
8. Auditor Independence and Competence
8.1 Independence
- Auditors do not audit work they designed, carried out, managed or are accountable for. A person who is the process owner of a process cannot audit it, nor can their direct report.
- Where the Organisation is too small to staff independent audits, it uses an auditor from another team or [an external auditor under contract], and records why.
- Auditors are free from pressure on findings. A manager may not change a finding; disagreement is recorded and resolved by the Management representative.
- Auditors declare any conflict of interest before the audit, and the Lead auditor decides whether they can take part.
- The Management representative may not lead an audit of the audit process itself; Top management appoints another.
8.2 Competence
| Requirement | Standard | Evidence |
|---|
| Knowledge of ISO/IEC 20000-1 and the Organisation's system | Completed internal auditor training of at least [2 days] | Training certificate, attendance record |
| Audit practice | Observed on at least [1] audit under a lead auditor before leading | Observation record |
| Process knowledge | Understands the audited process well enough to test it | Review by Management representative |
| Impartial conduct and confidentiality | Signed code of conduct | Signed undertaking |
| Currency | Refresher at least every [24 months] and after major change of the standard | Training record |
9. Audit Procedure
9.1 Inputs and outputs
| Inputs | Outputs |
|---|
| Approved audit programme | Audit plan and checklists |
| Standard, policies, procedures, contracts and legal requirements | Records of evidence |
| Previous audit reports and open actions | Audit report with findings |
| Performance data and incident history | Corrective action requests and follow-up verification |
9.2 Steps
- PlanThe Lead auditor prepares the audit plan with scope, criteria, team, dates, interviews and sampling, and sends it to the Process owner at least [10 business days] before the audit.
- PrepareThe team studies the procedures, earlier reports and recent performance and prepares the checklist in Annexure B. Target: [3 business days].
- Opening meetingThe Lead auditor confirms scope, schedule, method and confidentiality with the Process owner. Target: first day, [15 minutes].
- Collect evidenceThe team interviews staff, observes work, examines records and samples tickets, changes and releases. A sample of at least [10 percent or 10 records, whichever is greater] is taken from each population. Evidence is recorded with identifiers.
- Judge findingsThe team compares evidence with criteria, records conforming practice as well as nonconformities and rates each nonconformity as major or minor. The Lead auditor confirms findings with the team.
- Closing meetingThe Lead auditor presents the findings to the Process owner and Service owner, who may challenge facts but not the evidence. Target: last day of the audit.
- ReportThe Lead auditor issues the audit report in Annexure C to the Management representative and Process owner. Target: [5 business days] after the closing meeting.
- Corrective actionThe Process owner returns a corrective action plan for each nonconformity under the next section. Target: [10 business days].
- VerifyThe Lead auditor verifies that actions were done and effective. Target: within [30 days] of the due date of the action.
- CloseThe Management representative closes the audit when all findings are closed or accepted with a recorded decision.
9.3 Process flow
- Top management approves the audit programme.
- The Management representative appoints the audit team, checking independence and competence.
- The Lead auditor issues the audit plan to the Process owner.
- The team prepares, holds the opening meeting and collects evidence.
- Findings are judged and presented at the closing meeting.
- The audit report is issued and findings are entered in the improvement register.
- The Process owner plans corrective action and carries it out.
- The Lead auditor verifies effectiveness and the finding is closed.
- Audit results go to management review.
10. Findings, Nonconformity and Corrective Action
| Finding type | Meaning | Response | Time to correct and remove cause |
|---|
| Major nonconformity | Required process missing or failing, repeated failure, or significant effect on service or customers | Containment now; corrective action plan; Top management informed | Containment in [5 business days]; plan in [10 business days]; closed in [60 days] |
| Minor nonconformity | Isolated lapse against a requirement | Corrective action plan | Plan in [10 business days]; closed in [90 days] |
| Observation | A risk of failure or a weakness not yet a nonconformity | Owner decides and records a response | Response in [30 days] |
| Opportunity for improvement | A way to do better than the requirement | Entered in the improvement register | Prioritised at the next improvement review |
| Good practice | Practice worth repeating | Shared with other process owners | Noted in the report |
- ReactThe Process owner stops the nonconformity spreading and corrects its immediate effect, such as repairing a missing record or informing an affected customer. Target: as the table shows.
- Find the causeThe Process owner, with the Lead auditor consulted, finds the root cause using a method such as five whys or a cause diagram and records it. Time target: [10 business days].
- Decide the actionThe Process owner decides what will remove the cause, who owns it, the date and the evidence that will show it worked. Similar nonconformities elsewhere are checked.
- Carry outThe action owner completes the action by the date. Any change to live services follows the Change Management Procedure.
- Check effectivenessThe Lead auditor reviews the evidence and, where needed, re-tests. A nonconformity that recurs is raised again as major.
- Record and closeThe Management representative updates the nonconformity register and the improvement register, closes the item and reports status to Top management monthly.
Note. An overdue major nonconformity is escalated to Top management at once. If a corrective action cannot be done by its date, the owner requests an extension with a revised plan from the Management representative before the date passes.
11. Management Review
11.1 Frequency and participants
Top management reviews the service management system at least every [6 months]. The meeting is chaired by [the Chief Executive Officer or delegate]. Required attendees are Top management, the Management representative, the Head of Service Management and process owners who present items. The review may be called sooner after a major incident, a significant change or an adverse audit result.
11.2 Inputs
| Input | Provided by | Content |
|---|
| Status of actions from previous reviews | Management representative | Open and closed actions with dates |
| Changes in external and internal issues | Management representative | Legal, market, customer, organisational and technology change relevant to the system |
| Interested party needs | Service Delivery Manager | Customer and supplier requirements and feedback |
| Service management policy and objectives | Head of Service Management | Progress against objectives in the SMS Objectives |
| Service and process performance | Reporting analyst | KPI results, trends, service level attainment, major incidents |
| Customer satisfaction and complaints | Reporting analyst | Survey results, complaints and responses |
| Audit results | Lead auditor | Audit reports summary, open nonconformities and corrective action status |
| Nonconformities and corrective actions | Management representative | Register status and overdue items |
| Risks and opportunities | Risk owner | Changes in the service risk register |
| Supplier performance | Supplier manager | Supplier results and issues |
| Resources | Head of Service Management | Staffing, skills, tools and budget |
| Improvement opportunities | Reporting analyst | Improvement register and plan |
| Effectiveness of action on risks and opportunities | Risk owner | Outcome of risk treatment |
11.3 Outputs
| Output | Recorded as |
|---|
| Opportunities for improvement | Entries in the improvement register with owner and date |
| Need for change to the system, including policy, objectives, scope and processes | Decisions and change requests |
| Resource needs | Decisions on budget and people |
| Actions on risks, customer feedback and supplier performance | Actions with owner and date |
| Conclusion on the continuing suitability, adequacy and effectiveness of the system | Statement in the minutes |
| Next review date | Entry in the audit calendar |
11.4 Steps
- ScheduleThe Management representative sets the date [4 weeks] ahead and sends the agenda and input list.
- Collect inputsInput owners supply their items in the agreed format. Target: [5 business days] before the meeting.
- PackThe Management representative assembles a pack with a one-page summary and sends it [3 business days] before the meeting.
- HoldTop management works through the agenda in Annexure E, challenges data and records decisions.
- MinuteThe Management representative issues minutes in Annexure F within [5 business days] with actions, owners and dates.
- ActAction owners deliver; actions enter the improvement register. The Management representative reports status monthly to Top management.
- Report backThe outcomes are communicated to staff under the Communication Procedure within [10 business days].
12. Interfaces with Other Processes
| Process | Interface |
|---|
| Service Reporting and Continual Improvement Procedure | Supplies performance data; receives audit findings and review actions in the improvement register. |
| Documents and Records Management Procedure | Controls audit and review documents and their retention. |
| Communication Procedure | Sets how audit results and review outcomes reach staff. |
| Service Management Policy and SMS Objectives | Are the criteria audited and are reviewed at management review. |
| Information Security Monitoring and Compliance Policy | Information security audits are coordinated with these audits. |
13. Key Performance Indicators
| Measure | Target | Source | Frequency |
|---|
| Planned audits completed in the cycle | [100 percent] | Audit programme | Quarterly |
| Audit reports issued within [5 business days] | [95 percent] | Audit reports | Quarterly |
| Corrective action plans received within [10 business days] | [90 percent] | Nonconformity register | Quarterly |
| Major nonconformities closed within [60 days] | [100 percent] | Nonconformity register | Quarterly |
| Minor nonconformities closed within [90 days] | [90 percent] | Nonconformity register | Quarterly |
| Repeat nonconformities | [None] | Nonconformity register | Per audit cycle |
| Auditors meeting competence requirements | [100 percent] | Training records | Annually |
| Management reviews held as planned | [100 percent] | Review minutes | Annually |
| Management review actions completed on time | [85 percent] | Action log | Quarterly |
14. Records and Evidence
| Record | Content | Kept by | Retention |
|---|
| Audit programme and plans | Approved programme, plans, team and independence declarations | Management representative | [5 years] |
| Audit checklists and evidence | Completed checklists, sample lists, notes | Lead auditor | [3 years] |
| Audit reports | Reports and closing meeting records | Management representative | [5 years] |
| Nonconformity and corrective action register | All items to closure | Management representative | [5 years] |
| Auditor competence records | Training and observation records | Management representative | Employment plus [3 years] |
| Management review packs and minutes | Inputs, minutes, actions | Management representative | [5 years] |
Annexure A: Audit plan
| Field | Entry |
|---|
| Audit reference and title | |
| Scope, clauses and services | |
| Criteria | |
| Lead auditor and team | |
| Independence confirmed | |
| Dates and locations | |
| Interviewees and records to see | |
| Sampling approach | |
| Process owner informed on | |
Annexure B: Audit checklist
| Clause or requirement | Question or check | Evidence seen | Result (conforms, minor, major, observation) | Notes |
|---|
| | | | |
| | | | |
| | | | |
Annexure C: Audit report
| Section | Entry |
|---|
| Audit reference, dates, scope and criteria | |
| Team and auditees | |
| Summary and conclusion | |
| Areas of good practice | |
| Findings: nonconformities, observations, opportunities (numbered, with evidence) | |
| Follow-up from previous audit | |
| Distribution and date issued | |
| Field | Entry |
|---|
| Reference and date | |
| Audit or source | |
| Requirement not met | |
| Evidence | |
| Classification (major or minor) | |
| Immediate correction | |
| Root cause | |
| Corrective action, owner and due date | |
| Effectiveness check and date | |
| Closed by and date | |
Annexure E: Management review agenda
| Item | Presenter | Time |
|---|
| Opening, attendance, apologies, minutes and actions of the last review | Chair | [10 minutes] |
| Changes in context and interested party needs | Management representative | [10 minutes] |
| Policy, objectives and service performance | Head of Service Management | [20 minutes] |
| Customer satisfaction, complaints and supplier performance | Service Delivery Manager and Supplier manager | [15 minutes] |
| Audit results, nonconformities and corrective actions | Lead auditor | [15 minutes] |
| Risks and opportunities and the improvement register | Risk owner and Reporting analyst | [15 minutes] |
| Resources, suitability, adequacy and effectiveness | Top management | [10 minutes] |
| Decisions, actions, owners, dates and next review | Chair | [10 minutes] |
Annexure F: Management review minutes
| Field | Entry |
|---|
| Date, time, place | |
| Chair and attendees | |
| Apologies | |
| Previous actions and status | |
| Summary of each input and discussion | |
| Decisions on improvement, system change and resources | |
| Conclusion on suitability, adequacy and effectiveness | |
| Actions: description, owner, due date | |
| Date of next review | |
| Minutes approved by and date | |
Annexure G: Audit programme register
| Ref | Quarter | Clauses and processes | Lead auditor | Planned date | Actual date | Report ref | Status |
|---|
| | | | | | | |
| | | | | | | |
Annexure H: Document history
| Version | Date | Author | Change | Approved by |
|---|
| [1.0] | [date] | [author] | Initial issue | [approver] |
| | | | |
15. Exception
Exceptions to this document are allowed only where compliance is not practicable and the risk has been assessed. A request must state what is to be excepted, why, the risk it creates, the compensating controls, and an end date no later than [6 months]. It is approved in writing by the document owner and the risk owner, recorded in the exceptions register, and reviewed at the end date. An exception does not change the document.
16. Enforcement
Compliance is monitored through internal audits, management review and routine checks by the document owner. Non-compliance is reported through the incident or non-conformity process and handled under the organisation's disciplinary procedure, and under the terms of any contract for people who are not employees. Serious or repeated non-compliance may lead to loss of access and, where the law is broken, to referral to the authorities.
17. Review
This document is reviewed at least every [12 months], and when there is a significant change to the organisation, its systems, its risks or the law, or after an incident that shows it was not effective. Each review is recorded in the revision history.
ISO/IEC 20000-1:2018 references
| Reference | Title |
|---|
| 9.2 | Internal audit |
| 9.3 | Management review |
| 10.1 | Nonconformity and corrective action |
| 5.3 | Organizational roles, responsibilities and authorities |
| 4.3 | Determining the scope of the service management system |