Template draft. Replace everything in [square brackets] with your own decision,
delete what does not describe what you really do, and approve it through your own document control. It is not legal
advice and does not make an organisation compliant or certified.
1. Purpose
This document makes sure that every change to the Organisation's production environment is justified, assessed for security and business impact, authorised by the right person, tested, reversible, carried out in a controlled way and reviewed afterwards. The aim is to deliver change quickly where it is routine and carefully where it is risky, and to avoid unplanned outages and security weaknesses caused by uncontrolled change.
2. Scope
The policy and procedure apply to all changes to information processing facilities and services, whether made by staff, contractors or suppliers, and whether on premises, in the cloud or through a service provider.
- In scope: servers, endpoints in bulk, network and security devices, operating systems, databases, middleware, applications and their configuration, infrastructure as code, identity and access configuration, cloud accounts and services, scheduled jobs, data fixes in production, firewall rules, certificates, backup and monitoring configuration, and the retirement of any of these.
- In scope: changes to documents that define operation of controls, such as the runbook for a critical service.
- Out of scope: changes to a development or test environment that is isolated from production and holds no live data; individual user requests such as a password reset, handled under the User Access Management Procedure; and organisational change such as restructuring, handled by management.
3. Terms and Definitions
| Term | Meaning |
|---|
| Change | Any addition, modification, replacement or removal of something that could affect the security, availability or integrity of a service. |
| Request for change (RFC) | The recorded proposal for a change, using the change request form in Annexure A. |
| Change requester | The person who raises an RFC and is responsible for the business case. |
| Change owner | The person accountable for planning, testing and implementing the approved change. |
| Change manager | The person who runs the change process, maintains the change schedule and chairs the change advisory board. |
| Change advisory board (CAB) | A group that reviews and advises on changes of higher risk; its members are named in the roles table. |
| Emergency CAB (ECAB) | A small group of decision makers who can authorise an urgent change at short notice. |
| Standard change | A pre-approved, low-risk, repeatable change with a documented procedure and known outcome. |
| Normal change | A change that is assessed and approved through the full process. |
| Emergency change | A change that must be made urgently to restore service or close a serious security exposure. |
| Rollback plan | The tested set of steps that returns the service to its previous state if the change fails. |
| Change freeze | A period when only emergency changes are permitted, such as year-end close or a major event. |
4. Roles and Responsibilities
| Role | Responsibilities |
|---|
| Head of IT Operations (document owner) | Owns this document, appoints the change manager, approves the standard change list and reports change performance to management. |
| Change manager | Logs and triages RFCs, applies the risk matrix, runs the CAB, publishes the change calendar and conflicts report, and closes changes. |
| Change requester | States the reason, scope, benefit and desired date; supplies information requested during assessment. |
| Change owner | Prepares test, implementation, verification and rollback plans, books the window and carries out or supervises the work. |
| Technical reviewer | Peer reviews the technical plan and the test evidence, and confirms the rollback is realistic. |
| Information security manager | Assesses security impact, requires a security review where the matrix calls for it, and attends CAB for high-risk changes. |
| System owner and business owner | Confirms the business impact, approves timing and accepts residual risk for their system. |
| Change advisory board | Reviews high-risk and major changes, advises on conflicts, and recommends approval, rework or rejection. |
| Service desk | Records user-facing announcements, answers queries about outages and logs any incident that follows a change. |
| Internal audit | Samples changes against this procedure at least once a [year]. |
| Activity | Responsible | Accountable | Consulted | Informed |
|---|
| Raise a request for change | Change requester | Change requester | Change manager | Service desk |
| Verify and log the RFC | Change manager | Change manager | Change requester | Change owner |
| Assess impact and risk | Change owner | Change manager | Information security manager, system owner, technical reviewer | Change requester |
| Approve a normal or high-risk change | CAB | Head of IT Operations | System owner, information security manager | Change requester, service desk |
| Authorise an emergency change | ECAB | Head of IT Operations | Information security manager | Management, service desk |
| Implement the change | Change owner | Change owner | Technical reviewer, system owner | Change manager, service desk |
| Review the result and close | Change manager | Head of IT Operations | Change owner, change requester | CAB |
| Communicate to stakeholders | Change manager | Change manager | Service desk, system owner | Affected users and customers |
5. Change Management Policy
5.1 Principles
- No change may be made to a production system without an approved RFC, except a standard change from the approved list or an emergency change handled under the emergency route and recorded afterwards.
- Production, test and development must be separated, and changes must be tested in a representative non-production environment before being released to production.
- Nobody may approve their own change. The person who implements a change must not be the sole approver and, for high-risk changes, the reviewer must be independent of the change owner.
- Every change must have a rollback plan that has been reviewed, and, for medium and high risk, rehearsed or reasoned through with evidence.
- Every change must be recorded in the change register with its outcome, so that incidents can be traced to changes and changes can be traced to incidents and problems.
- Security impact is assessed for every change. Changes that alter authentication, network boundaries, encryption, logging, data stores or externally exposed services need review by the information security manager.
- Changes that touch personal data or move data to a new location or supplier need a review by the data protection officer, and the Data Protection and Privacy Procedure applies.
5.2 Change windows and freezes
- Normal changes are carried out in the agreed change windows: [Tuesday and Thursday, 22:00 to 02:00 local time] for production and by agreement for customer-impacting changes.
- Change freezes are announced by the change manager at least [10 working days] in advance. During a freeze only emergency changes are allowed, and each one needs ECAB approval.
- No high-risk change may be scheduled on a Friday, before a public holiday or when key staff for the service are absent, unless the CAB records why the date is justified.
5.3 Change risk matrix
The change manager scores risk using impact and likelihood. The result sets the approval authority and the amount of testing.
| Impact of failure | Likelihood low (tested, repeated) | Likelihood medium | Likelihood high (new, complex, untested) |
|---|
| Low: one non-critical service, easy rollback | Low | Low | Medium |
| Medium: a business service degraded, rollback within [2 hours] | Low | Medium | High |
| High: a critical or customer-facing service, personal data or security control at stake | Medium | High | High |
5.4 Approval authority
| Change category | Approver | Minimum lead time | Testing and review |
|---|
| Standard | Pre-approved by the change manager; template owner reviews the list [every 6 months] | [1 working day] notice | As defined in the template |
| Normal: low risk | Change manager | [3 working days] | Peer review and basic test evidence |
| Normal: medium risk | Change manager and system owner | [5 working days] | Test in non-production, technical review, rollback documented |
| Normal: high risk or major | CAB, with Head of IT Operations accountable | [10 working days] | Full test, security review, rehearsed rollback, business sign-off, communication plan |
| Emergency | ECAB: Head of IT Operations or delegate, plus the information security manager or delegate | Immediate, within [2 hours] of request | Minimum viable test; full documentation within [2 working days] |
6. Change Management Procedure
6.1 Raise a request for change
- Complete the formThe requester completes the change request form (Annexure A) with title, reason, description, systems affected, desired date, benefits, and what happens if the change is not made. Input: need or ticket. Output: RFC. Target: same day as the need is identified.
- Attach supporting materialAttach design, vendor advisory, vulnerability reference, ticket numbers, or test results. Tag the RFC to any related incident or problem.
- SubmitSubmit through [the ticketing tool], which allocates the unique RFC number and notifies the change manager.
Note. Where an RFC arises from a vulnerability fix or a security incident, the requester states the severity and the patch deadline from the Patch Management Policy so that priority can be set correctly.
6.2 Verification of the request
- Check completenessThe change manager checks within [1 working day] that the form is complete, the requester is authorised, and the change does not duplicate another RFC. Incomplete RFCs go back with a reason.
- Check authority and fitThe change manager confirms that the change fits the service, architecture and security standards, and that a business owner supports it.
- LogLog the RFC in the change register with status Verified, requester, owner, date and linked records.
6.3 Impact assessment
- Identify what is affectedThe change owner lists the systems, data, users, suppliers and customers that the change touches, using the asset register and configuration records.
- Assess security impactThe information security manager reviews the change for effect on confidentiality, integrity, availability, access, logging and privacy, and records findings and conditions.
- Assess resource and timing impactEstimate effort, skills, outage time, dependency on other changes, and conflicts with the change calendar or freezes.
- Record the assessmentRecord the assessed impact and likelihood in the RFC. Target: within [3 working days] for normal changes.
- Questions to answer: Can the service run without this change? Which services depend on the system? What happens to data if the change stops halfway? Who needs to be told? Does it change the Statement of Applicability or the risk register?
6.4 Categorisation of the change
- Choose the typeThe change manager classifies the RFC as standard, normal or emergency, using the definitions in this document.
- Set the risk levelApply the change risk matrix and record low, medium or high.
- RouteStandard changes go straight to scheduling. Low and medium normal changes go to the change manager. High risk changes are put on the next CAB agenda.
6.5 Rollback plan
- Write the planThe change owner documents the exact steps to restore the previous state, the point after which rollback is no longer possible, the time needed to roll back and who decides to roll back.
- Prepare the meansTake a backup or snapshot, save the old configuration, keep the previous release available, and make sure data changes can be reversed or restored.
- Set a triggerState the failure conditions that start the rollback, for example verification fails, error rate above [2%], or the window ends before completion.
- ValidateThe technical reviewer confirms the plan is feasible. For high-risk changes the rollback is rehearsed in the test environment, and the result attached.
Note. A change with no rollback is only allowed if the CAB records why rollback is impossible, what the fix-forward plan is, and who accepted the risk.
6.6 Rejection or return of an RFC
- The change manager or CAB may reject or return an RFC that is incomplete, unsafe, untested, in conflict with a freeze, or without business support. The decision, the reason and the person who decided are recorded in the RFC within [1 working day].
- The requester is notified and may resubmit with the issues resolved. A rejected RFC is closed; it is not edited and reused, so the history is kept.
- A rejection may be escalated to the Head of IT Operations within [5 working days], whose decision is final.
6.7 Submit the change for approval
- Complete the packageThe change owner attaches the plan, test evidence, security review, rollback plan, communication plan, window and resource booking.
- SubmitThe change manager checks the package against the approval table and sends it to the right approver or places it on the CAB agenda. CAB papers go out at least [2 working days] before the meeting.
6.8 Approval of the change
- ReviewApprovers review the package. CAB meets [weekly] and records attendance, questions and decisions in the minutes (Annexure C).
- DecideThe outcomes are approved, approved with conditions, deferred, or rejected. Conditions are written into the RFC.
- ConfirmThe change manager updates the register and the change calendar, and informs the requester and owner within [1 working day].
- Quorum for CAB: the change manager, one representative of IT Operations, the information security manager and the relevant system owner.
- Where an approver is absent, a named delegate may act. Delegations are recorded and renewed [yearly].
6.9 Prioritisation of the change
| Priority | Meaning | Target start |
|---|
| Emergency | Service down, or security exposure under active exploit | Immediately, within [2 hours] of ECAB approval |
| High | Serious risk or major business benefit, deadline set by a vendor, regulation or patch policy | Within [5 working days] |
| Medium | Valuable improvement or moderate risk reduction | Next available window, within [20 working days] |
| Low | Minor improvement, cosmetic or convenience change | Scheduled by capacity, within [60 days] |
The change manager sets priority using the urgency stated by the requester and the risk matrix. When two changes conflict, the higher priority goes first; if equal, the change with the lower risk goes first.
6.10 Types of change: normal, emergency and standard
6.10.1 Normal change
Follows every step in this procedure. It is scheduled in a standard change window and reviewed after implementation.
6.10.2 Standard change
- A standard change template must define the trigger, the exact steps, the systems it may touch, the evidence to keep, a risk rating of low and the owner. The Head of IT Operations approves each template and reviews all templates every [6 months].
- Examples: adding a user to a group under an approved request, renewing a certificate with the same key policy, installing a monthly operating system update that has passed the patch test group, adding a firewall rule from a pre-approved catalogue.
- A standard change is logged, either automatically or in a short record, but does not need CAB. If the result differs from the template, it is handled as a normal change.
6.10.3 Emergency change
- RequestThe service owner or incident manager calls the change manager or Head of IT Operations, who convenes the ECAB by phone or chat. Time target: within [30 minutes].
- AuthoriseECAB approves the action, a rollback approach and the people allowed to act. A verbal approval is recorded in writing at once.
- ImplementDo the minimum needed to restore service or remove the exposure. Keep a log of every command or action.
- Document afterwardsThe RFC is completed within [2 working days] and reviewed at the next CAB. Emergency changes are counted in the monthly report, and a trend of more than [10%] of all changes triggers a review of planning.
6.11 Co-ordination of implementation
- ScheduleThe change manager places the approved change in the change calendar and checks for clashes with other changes, freezes, backups and business events.
- PrepareThe change owner confirms resources, access, pre-change backup, runbook and test accounts. Where needed a go/no-go call is held [1 hour] before the window.
- NotifyStakeholders receive the notice set in the communication section.
- Hand overFor changes that span teams or suppliers, a single coordinator is named and an escalation contact list is shared.
6.12 Successful change implementation
- ImplementThe change owner carries out the steps in the runbook, logging time and result for each step.
- VerifyRun the verification checks defined in the plan: service health, monitoring alerts, security controls, logging, and user acceptance where applicable.
- DecideIf verification passes within the window, the change is declared successful. If any trigger condition occurs, roll back and record why.
- Update recordsUpdate configuration records, asset register, diagrams, documentation, and backups. Attach evidence to the RFC within [1 working day].
- Close or holdA successful change moves to review. A failed change is marked Failed or Backed out and an incident or problem is raised where appropriate.
6.13 Meeting the change objective
- ReviewThe change manager and requester hold a review after [5 working days] for medium and high risk changes, or when the benefit takes time to appear.
- CompareCheck whether the stated objective was achieved, whether unexpected effects occurred, and what the actual effort and downtime were against plan.
- LearnRecord lessons learned and update standard templates, test plans or checklists. Where the objective was not met, raise a follow-up RFC or problem record.
- CloseClose the RFC with status Successful, Successful with issues, Failed, or Cancelled.
6.14 Communication to stakeholders
| Audience | What they are told | When | Channel and sender |
|---|
| Affected internal users | Reason, expected impact, time, what to do, who to contact | [3 working days] before, and [1 hour] before for outages | Email and intranet; service desk |
| Customers affected | Planned maintenance window, impact, workaround, completion | As per contract, at least [5 working days] before | Status page and account contact; customer success |
| System and business owners | Approval, timing, results | Before and after | Ticket notification; change manager |
| Service desk | Briefing and knowledge article for likely queries | [1 working day] before | Ticket and briefing; change owner |
| Suppliers involved | Schedule, access needs and contacts | [3 working days] before | Email; change owner |
| Management | Summary of high-risk and emergency changes, failures and trends | [Monthly] | Report; Head of IT Operations |
| Everyone | Completion notice and any follow-up | Within [1 hour] of completion | Same channel as the original notice |
Notices are short and use plain wording. A cancelled or overrunning change is announced as quickly as a started one, with the new time or the reason it will not go ahead.
7. Security Review Checklist for Changes
The information security manager, or a delegate, uses these questions for every medium and high-risk change. A no answer needs a recorded condition or an accepted risk.
| Area | Question | Evidence |
|---|
| Access | Does the change create, widen or remove access? Are privileged accounts needed only for the window and then removed? | Access request and removal record |
| Network | Does it open ports, change routing, or expose a service to the internet? Is the rule time-bound and justified? | Firewall rule record, scan |
| Data | Does it move, copy, mask or delete data? Is personal data affected? Is production data used in test? | Data flow note, privacy review |
| Cryptography | Does it use approved algorithms and managed keys? Are certificates and keys covered by the inventory? | Configuration extract |
| Logging | Will logs still be produced, protected and monitored after the change? Are time sources unchanged? | Log sample, monitoring check |
| Resilience | Is the backup current, restore proven, and the capacity sufficient for the new state? | Backup job result, test record |
| Third parties | Is a supplier involved? Is the supplier access controlled, logged and removed after the work? | Supplier access record |
| Baseline | Does the final state match the secure configuration baseline? Are baseline records updated? | Baseline scan result |
8. Change Types by Example
| Example | Type | Why |
|---|
| Add an approved user to a project group | Standard | Repeatable, low risk, covered by the access procedure |
| Update a library version in a customer-facing application | Normal, medium | Tested release, but a failure would be customer-visible |
| Replace the core network firewall | Normal, high | Single point of failure; needs CAB and a rehearsed rollback |
| Block an address range during an active attack | Emergency | Immediate security exposure; document within [2 working days] |
| Change a log retention setting | Normal, medium | Affects evidence and legal duties; security review needed |
| Move a database to another hosting region | Normal, high | Personal data location changes; data protection review needed |
9. Compliance and Monitoring
- The change manager reconciles the change register against system logs, deployment records and detected configuration drift each [month] to find changes made without an RFC.
- The information security manager reviews unauthorised changes as incidents. Repeated unauthorised change by one team or person is reported to management.
- Internal audit samples at least [25] changes per [year], covering each type and risk level, and tests that approval, testing, rollback and review evidence exists.
10. Measures
| Measure | Target | How measured |
|---|
| Changes implemented with an approved RFC | [100%] | Register against detected changes |
| Changes completed successfully with no incident | [95%] or higher | Closed RFCs without linked incident |
| Emergency changes as a share of all changes | [5%] or lower | Register count |
| Changes backed out or failed | [3%] or lower | Closure status |
| RFCs assessed within the time targets | [90%] | Timestamps |
| Post-implementation reviews done on time | [95%] | Review dates |
| Incidents caused by change | [Trending down quarter on quarter] | Incident cause code |
11. Records and Evidence
- Change register, containing every RFC with status, owners, approvals, dates and outcome, kept for [3 years].
- CAB and ECAB minutes, attendance and decisions, kept for [3 years].
- Test evidence, rollback plans, communication notices and post-implementation reviews, attached to the RFC and kept with it.
- Standard change templates with approval and review dates, kept while current and [2 years] after retirement.
| Field | Entry |
|---|
| RFC number | |
| Date raised and requester | |
| Title and description | |
| Reason and benefit | |
| Systems, data and users affected | |
| Requested date and window | |
| Type: standard, normal or emergency | |
| Impact, likelihood and risk level | |
| Security and privacy review (name, date, conditions) | |
| Test plan and test result | |
| Implementation steps | |
| Rollback plan, trigger and time needed | |
| Communication plan | |
| Approver names, decisions and dates | |
| Implementation result and date | |
| Post-implementation review outcome | |
Annexure B: Change register
| RFC no. | Title | Type | Risk | Owner | Approved by and date | Planned date | Result | Review done |
|---|
| | | | | | | | |
| | | | | | | | |
Annexure C: CAB meeting record
| Item | Entry |
|---|
| Date, chair and attendees | |
| RFCs reviewed (numbers) | |
| Decision per RFC and conditions | |
| Conflicts and freezes discussed | |
| Emergency changes reviewed since last meeting | |
| Actions, owners and dates | |
Annexure D: Post-implementation review
| Item | Entry |
|---|
| RFC number and title | |
| Objective achieved (yes, partly, no) | |
| Planned and actual downtime | |
| Incidents or issues caused | |
| Lessons learned and template updates | |
| Reviewer and date | |
12. Exception
Exceptions to this document are allowed only where compliance is not practicable and the risk has been assessed. A request must state what is to be excepted, why, the risk it creates, the compensating controls, and an end date no later than [6 months]. It is approved in writing by the document owner and the risk owner, recorded in the exceptions register, and reviewed at the end date. An exception does not change the document.
13. Enforcement
Compliance is monitored through internal audits, management review and routine checks by the document owner. Non-compliance is reported through the incident or non-conformity process and handled under the organisation's disciplinary procedure, and under the terms of any contract for people who are not employees. Serious or repeated non-compliance may lead to loss of access and, where the law is broken, to referral to the authorities.
14. Review
This document is reviewed at least every [12 months], and when there is a significant change to the organisation, its systems, its risks or the law, or after an incident that shows it was not effective. Each review is recorded in the revision history.
ISO/IEC 27001:2022 references
| Reference | Title |
|---|
| A.8.32 | Change management |
| A.8.31 | Separation of development, test and production environments |
| A.8.19 | Installation of software on operational systems |
| A.8.9 | Configuration management |
| A.5.37 | Documented operating procedures |
| 8.1 | Operational planning and control |