AI Risk Criteria and Assessment Methodology Procedure

This procedure sets out the AI risk criteria and the methodology used to identify, analyse, evaluate and treat risks arising from SecureXcel’s AI systems.

SecureXcel/AIMS/B-010Procedure2,356 words 11 min readOwner: GRC & Compliance Team
Sign in to download the Word documentSign in to download the PDFFree. You return straight to this page after you sign in.
Published as written. This is SecureXcel's own working document, shown with its document control and notices as they appear in the file. Adapt it to your organization, approve it through your own document control, and treat it as a starting point: it is not legal advice and does not make an organization compliant or certified.

Document control

Document ID: B-010

Author(s): GRC & Compliance Team

Version: 1.0

Date: 09-Nov-2026

Disclaimer:

This controlled document is intended for authorized SecureXcel use. It may not be reproduced, distributed, quoted, or disclosed outside its approved audience without prior authorization from the document owner.

Document TitleAI Risk Criteria and Assessment Methodology Procedure
Document IdSecureXcel/AIMS/B-010Current Version1.0Date of Release09-Nov-2026
ClassificationInternalAuthorGRC & Compliance Team
Reviewed byGRC & Compliance Lead
Approved byManagement RepresentativeAI Governance Committee (AIGC)
Designation

Revision History

VersionDateAuthorGRC & Compliance TeamGRC & Compliance LeadManagement Representative
1.025/09/2026GRC LeadGRC HeadAIGCInitial version

1. Introduction

This procedure sets out the AI risk criteria and the methodology used to identify, analyse, evaluate and treat risks arising from SecureXcel’s AI systems. It implements ISO/IEC 42001:2023 clauses 6.1.1 (AI risk criteria), 6.1.2 (AI risk assessment), 6.1.3 (AI risk treatment), 8.2 and 8.3 (operational assessment and treatment), and supports the AI system impact assessment required by clause 6.1.4.

It supplements the Risk Management Policy and Procedure (A02), which governs information-security risk, and the AI Risk Management and Customer Relationship Procedure (B-008), which defines the overall risk cycle. Where this procedure and A02 differ on an AI risk, this procedure prevails.

2. Scope

AI Risk Criteria and Assessment Methodology Procedure

  • All AI systems, models, AI-enabled features and externally supplied AI services formally included in the approved AIMS scope and AI System Inventory, together with any system added after a recorded scope decision.
  • All lifecycle stages: requirements, design and development, verification and validation, deployment, operation and monitoring, change, and retirement.
  • AI components supplied by third parties, including cloud services, external APIs and open-source models.
  • Employees, contractors and suppliers who identify, assess, own or treat AI risks.

3. Roles, Responsibilities and Authorities

RoleResponsibility and Authority
AI Governance Committee (AIGC)Approves this procedure and any change to the risk criteria. Accepts residual risks rated High. Reviews risks scored Major or above on the individuals, groups and society dimension.
Top Management (CEO)Informed of all Critical risks. Gives written approval in the rare case that a Critical residual risk is accepted.
AIMS Manager (GRC Head)Accountable for maintaining the criteria and the AI risk register, for consistency with A02 and B-008, and for reporting risk status at management review.
GRC LeadCoordinates assessments, facilitates workshops, maintains the register and its links to the impact assessment and the Statement of Applicability.
AI System OwnerDefines the context of the AI system, identifies and rates its risks, owns the treatment plans and reports progress.
Risk OwnerNamed individual responsible for one risk, its controls and its treatment actions until closure.
Information Security & GRC Lead and Security TeamProvide security and privacy input to assessments and confirm the effectiveness of technical controls.
Legal & ComplianceIdentifies legal and contractual requirements (TRAI, DoT, DPDPA and others) and advises on regulatory risk.
Internal Audit (GRC)Verifies that assessments follow this procedure and reports findings through the internal audit programme.

4. Relationship to Other Documents

DocumentHow it relates
Risk Management Policy and Procedure (A02)Parent policy for risk management. This procedure adds AI-specific criteria and aligns the risk levels to the 5–25 scoring scales.
AI Risk Management and Customer Relationship Procedure (B-008)Defines the risk cycle and supplier and customer controls. Its risk criteria (section 3.1) are met by section 5 of this procedure.
AI System Impact Assessments Procedure (B-003)The impact assessment result is the mandatory input for the consequence rating of individuals, groups and society.
AI Technology Risk RegisterThe register where risks are recorded. It uses the likelihood scale, impact scale and heat map adopted in section 5.
Statement of Applicability (SoA)Records the Annex A controls selected to treat AI risks and the justification for each.
AI Model Monitoring and Improvement Policy (AI-005)Supplies the monitoring metrics, thresholds and alert levels that feed risk likelihood and key risk indicators.

5. AI Risk Criteria

5.1 Likelihood Scale

Likelihood is scored from 5 to 25. The scale is the same as in the AI Technology Risk Register (Annexure 1).

ScoreRatingOccurrence in the futureOccurrence in the past
25Almost CertainRoutine feature every month within the next yearSimilar events commonly occurred every month
20LikelyMay arise several times within the next yearSimilar events occurred several times in the past year
15PossibleMay arise once or twice within the next yearOne or two similar events in the past year
10UnlikelyMay occur once or twice between year 2 and year 5Similar events in the last 2 to 5 years, not routinely
5RareAlmost impossible between year 2 and year 5Similar events have never occurred

5.2 Impact Scale

Impact is scored from 5 to 25 in each dimension. The impact score of a risk is the highest score across all dimensions. The organisational dimensions follow Annexure 2 of the register; the last column is added by this procedure to meet clause 6.1.2 d) 1), which requires the consequences for individuals, groups and society to be assessed.

ScoreRatingOrganisation (financial, per register)Individuals, groups and society (SecureXcel AI Services)
25Catastrophic30% or more of capital or investments, or PBT reduced by over 5%Protection fails, or legitimate traffic is blocked, at national scale; regulator or licence action
20Major20–30% of capital or investments, or PBT reduced by 3.5–5%Systematic false blocking of a sender category, or fraud reaching consumers at scale; mandatory regulator notification
15Moderate10–20% of capital or investments, or PBT reduced by 2–3.5%Repeated false positives for a sender group, or personal data of a limited number of people exposed without harm
10Minor5–10% of capital or investments, or PBT reduced by 0.5–2%Isolated false positives or negatives corrected within the service level
5InsignificantUnder 5% of capital or investments, or PBT reduced by under 0.5%No identifiable person or group affected

Reputation, stakeholder, operational and strategic criteria in Annexure 2 of the register apply unchanged.

5.3 Risk Rating and Levels

Inherent and residual risk are calculated as Likelihood × Impact. The level is taken from the table below. A score of exactly 75 is Low; the register leaves this value unassigned and this procedure closes the gap.

LevelScoreRequired action
CriticalOver 260Immediate action. Monthly progress reports to management.
High151 to 260Senior management attention. Treatment plan with owner and date.
Moderate76 to 150Functional head attention. Periodic monitoring.
Low75 or lessManage by routine procedures.

5.4 Risk Acceptance Criteria

Residual levelWho may acceptConditions
LowRisk ownerRecorded in the register. Reviewed annually.
ModerateAI System Owner with the functional headJustification recorded. Reviewed at least quarterly.
HighAIGCMinuted decision, treatment plan with owner and target date, reviewed at every management review.
CriticalNot acceptedTreated immediately. Acceptance only for a critical business requirement, with written approval of the CEO and AIGC, a compensating control and a review within 6 months.

A risk scored Major or above on the individuals, groups and society dimension is reviewed by the AIGC whatever its residual level.

6. AI Risk Assessment Procedure

6.1 Assessment Steps

#StepActivityOutput
1Establish contextAI System Owner records purpose, users, jurisdictions, data, model types, suppliers and the current impact assessment.System context record
2Identify risksWorkshop using the risk sources in B-008 Appendix B (fairness, robustness, safety, security, transparency, privacy, environment), impact assessment findings, monitoring indicators, incidents, supplier information and legal requirements.List of risks with IDs
3Rate consequenceScore every dimension in section 5.2. Take the severity for individuals, groups and society from the impact assessment. The highest score is the impact.Impact score
4Rate likelihoodScore using section 5.1 with evidence: incidents, monitoring data, test results.Likelihood score
5Calculate inherent riskLikelihood × Impact. Read the level from section 5.3.Inherent score and level
6Assess controlsList existing controls. Rate their effectiveness using Annexure 7 of the register. Re-score likelihood and impact to give the residual risk.Residual score and level
7EvaluateCompare the residual level with the acceptance criteria in section 5.4 and prioritise risks for treatment.Prioritised list
8RecordEnter the risk in the AI Technology Risk Register with its impact assessment finding and SoA control links.Updated register

6.2 Frequency and Triggers

Every AI system is assessed:

  • Before deployment or purchase, together with the impact assessment.
  • Before any material change: new model version, new data source, new customer segment or new jurisdiction.
  • After an AI incident, or any Level 3 or Level 4 monitoring alert under AI-005.
  • When an impact assessment identifies a new consequence. The register is updated within 7 days.
  • At least annually, aligned with the impact assessment review, and quarterly for risks rated High or Critical.

7. AI Risk Treatment and Residual Risk

Risks that do not meet the acceptance criteria are treated as follows:

  • Select a treatment option: modify the risk with controls, retain it, avoid it by stopping the activity, or share it with a supplier or customer through a contract (B-008 section 3.3.1).
  • Determine the controls needed and compare them with ISO/IEC 42001:2023 Annex A to confirm that no necessary control is omitted. Add controls beyond Annex A where required.
  • Record each treatment in a plan with the objective, actions, owner, resources, target date, key risk indicators with comfortable, warning and critical thresholds, and the expected residual level.
  • Update the Statement of Applicability when a control is added or its status changes.
  • Obtain approval of the treatment plan and of the residual risk from the authority in section 5.4 before implementation. Keep the approval as a record.

8. Monitoring, Reporting and Review

  • Risk owners update key risk indicators at the frequency set in the register. The GRC Lead compiles a monthly report to the AIGC.
  • The AIGC reviews all High and Critical risks quarterly.
  • Risk status, changes to the risk profile and treatment progress are inputs to every management review under clause 9.3.
  • Internal audit checks that assessments follow this procedure and that treatment actions close on time.
  • This procedure is reviewed at least annually and after any AI incident that shows the criteria were inadequate.

9. Records and Documented Information

RecordOwnerRetention
AI Technology Risk Register and change historyAIMS ManagerMinimum 3 years
Risk assessment record (Appendix B)AI System OwnerMinimum 3 years
Treatment plans and approvalsRisk OwnerMinimum 3 years
AIGC decisions on risk acceptanceGRC LeadMinimum 3 years
Management review inputs on riskGRC LeadMinimum 3 years

Where the AI Data Protection and Retention Policy (AI-002) sets a longer period, that period applies.

10. Compliance with ISO 42001:2023 and Other Standards

RequirementWhere metClause
AI risk criteria including acceptance criteriaSection 56.1.1
Consistent, valid and comparable assessmentSections 5 and 66.1.2 a), b)
Risk sources and consequences for individuals and societySections 5.2 and 6.16.1.2 c), d) 1)
Likelihood, level and prioritisationSections 5.3 and 6.16.1.2 d) 2), 3), e)
Treatment options, controls, SoA and approvalSection 76.1.3
Planned intervals and change triggersSection 6.28.2, 8.3
Documented information retainedSection 96.1.2, 7.5
Information security risk managementRisk Management Policy and Procedure (A02)ISO/IEC 27001:2022 6.1.2

Appendix A: Proposed Additions to the AI Risk Register (SecureXcel AI Services)

The 15 risks in the AI Technology Risk Register (KR-AI-T-01 to 15) are technology risks. The risks below are proposed for a new KR-AI-E series. Scores are proposals for the risk owners to confirm; residual scores are set after control effectiveness is reviewed.

IDRiskInherent (L × I)Suggested owner
KR-AI-E-01Legitimate senders over-blocked, causing unfair outcomes for a sender group15 × 15 = 225 HighAI System Owner
KR-AI-E-02Fraud and phishing messages reach consumers at scale after evasion or drift15 × 20 = 300 CriticalAI System Owner
KR-AI-E-03Personal data in message content exposed or processed outside its lawful basis10 × 20 = 200 HighInformation Security & GRC Lead / Legal
KR-AI-E-04Data poisoning, model inversion or exfiltration20 × 15 = 300 CriticalInformation Security & GRC Lead
KR-AI-E-05Third-party components fail or misbehave, including APIs and open-source model licences15 × 15 = 225 HighProcurement / AI System Owner
KR-AI-E-06Regulatory change (TRAI, DoT, DPDPA Rules, EU AI Act) makes a control or claim non-compliant15 × 15 = 225 HighLegal & Compliance
KR-AI-E-07Use beyond intended purpose, such as political filtering or surveillance10 × 20 = 200 HighAIGC
KR-AI-E-08Human oversight fails through review-queue backlog or analyst error15 × 10 = 150 ModerateAI System Owner
KR-AI-E-09Training labels or data provenance unreliable, hiding bias15 × 15 = 225 HighData Engineering Lead
KR-AI-E-10Retention and deletion conflict or fail (DoT retention against DPDPA erasure)10 × 15 = 150 ModerateData Governance
KR-AI-E-11Staff lack AI awareness or role-specific competence15 × 10 = 150 ModerateHR
KR-AI-E-12Compute and energy use of AI workloads exceeds targets15 × 5 = 75 LowIT

Appendix B: AI Risk Assessment Record

Each assessment is documented using these fields, held in the AI Technology Risk Register or in a linked record.

FieldContent
Risk ID and titleUnique ID and a short heading
AI system and lifecycle stageSystem ID from the AI system inventory and the stage affected
Risk sourceSource from B-008 Appendix B or a supplier, legal or incident source
Risk event and descriptionWhat could happen and why
Impact assessment linkFinding ID in the current impact assessment and the consequence for individuals, groups and society
Likelihood and impactScores with the evidence used, per sections 5.1 and 5.2
Inherent riskScore and level
Existing controlsControls in place, their effectiveness rating and evidence
Residual riskScore and level after controls
SoA control referenceAnnex A control or controls that treat the risk
Treatment planOption, actions, owner, resources, target date, key risk indicators
AcceptanceApproving authority, decision and date
Review dateNext scheduled review and last review outcome